Yes those things are back, and they need doing and there's last minutes involved and everything.
OK, I'll start from the beginning, which was two weeks ago. We were give a sheet of paper on with a picture of some weird and wonderful mechanical device on it along with some dimensions.
The task was to draw a technical drawing of it. Not too bad, I've had practice at doing the drawings and I'm reasonably good at it.
So I do what I usually do, leave it to the last possible available time to do it. My question is this, when you leave things to the last minute, why do things always take just slightly longer than you have time for to complete?
I got the drawing done OK, but I was 10 minutes late for a half hour tutorial, which caused much turning round and generally unwanted attention.
God damn things, I'ma put a hex on things, or become PM and make things illegal or summat.
</things>
39589 rabbits met their end in Phil's colon.
Is Dave a liar?